Entering job costs for equipment time and materials billing
Note: This functionality is available only if you have the Equipment Module.
To enter job costs for time and materials billing:
- Open 8-4 Equipment Allocation.
-
In the transaction header, enter information about the allocation that will be passed to General Ledger when you post the transaction:
-
Transaction#. Type a code to identify the allocation transaction.
-
Transaction Date. This date identifies the date for the allocation transaction. It can be different from the dates the equipment was processed to the jobs in the allocation grid.
-
Description. Type a short description (up to 50 characters) to explain the allocation, or select a standard description from the quick list.
-
- For each piece of equipment for which you want to create a cost record:
- In the Date cell, enter the date of equipment use.
- In the Description cell, enter a brief statement about the work.
- In the Job cell, enter the job number.
- In the Phase cell, enter the phase number.
- In the Cost Code cell, enter the cost code number.
- In the Operated Equipment cell, enter the equipment number.
- In the Operated cell, enter the number of units that the equipment was operated.
- In the Standby cell, enter the number of units that the equipment was on standby.
- In the Idle cell, enter the number of units that the equipment was idle.
- In the Rental Unit cell, enter the number for the type of unit by which you bill the equipment.
- In the Operated Rental cell, enter the number of units for which you are billing.
- In the Standby Rental cell, enter the number of units for which you are billing.
- In the Idle Rental cell, enter the number of units for which you are billing.
- Click > .
Tip: In the 6-3 Job Cost window, you can edit the equipment details that Sage 100 Contractor uses to create time and materials invoices.